Plan for Safety - Safer by Design- Spotlight on SSE(Renewables) BESS (Battery Energy Storage System) Project at Ferrybridge

Join Ricky Harker and Michael Bobby speaking about a Project at Ferrybridge.

Construction

£ 0.00 [Member]
£ 30.00
Includes UK VAT (20.00 %)

Please login or register to continue, and access member prices.

Scottish and Southern Energy (SSE) renewables currently have a 150MW BESS ( Battery energy storage system) underway on the footprint of the old Ferrybridge coal PowerStation, Ricky Harker (construction site supervisor) and Michael Bobby (SHW CDM Advisor) talk us through the project management side of things.

Ricky will provide information on the Construction Works involved on an SSE BESS Project (Ferrybridge). Michael will be discussing information on the role of PD/CDM/A and the Project Type Specific challenges SSE face in relation to CDM2015.